MegaDeck® HD+ Composite Mats Create a Stable Working Platform for a 500-Ton Crane Over Saturated Ground

Portzei HaDerech Temporary Ways Ltd. specializes in temporary access roads, heavy-duty working platforms and ground protection solutions for challenging sites requiring safe access for cranes, heavy vehicles and other equipment.

For the erection of a 400 kV electricity transmission structure in central Israel, the company faced particularly difficult ground conditions. The project required a 500-ton (453.6 tonnes) Liebherr crane, several supporting cranes and additional heavy equipment to operate on agricultural land with soft, water-saturated, marsh-like soil approximately 2.5 feet (0.76 meters) deep.

THE CHALLENGE

Before crane operations could begin, Portzei HaDerech needed to transform an otherwise inoperable area into a stable heavy-duty working platform.

The extremely weak ground presented a significant challenge for a lifting operation reaching approximately 165 feet (50 meters) in height. The platform needed to distribute the loads of the 500-ton main crane and supporting equipment while providing the stability required throughout the operation.

Site conditions also limited the available ground stabilization options. No foreign fill material could be introduced into the agricultural area, and the natural movement of water through the site needed to remain unobstructed.

THE SOLUTION

Heavy-duty crane mats for electrical transmission structureApproximately 800 MegaDeck HD+ composite mats were used to create the temporary work platform. Beneath the main 500-ton crane, Portzei HaDerech constructed three interconnected layers of MegaDeck HD+ to provide the required configuration.

A four-person crew, supported by a wheel loader and Bobcat, completed installation in approximately two working days. The MDX pinning system allowed individual mats to function as one continuous, interconnected platform, helping maintain stability across the working area.

The rapidly deployed system eliminated the need to construct the platform using imported material. Once installed, the MegaDeck HD+ mats distributed crane loads over a larger area while minimizing disturbance to the underlying agricultural ground.

“The reaction from the crane teams was one of the most memorable parts of the project. Initially, they did not believe that a crane of this size could operate safely under such difficult ground conditions. After the platform was checked and operations began, they saw that it provided the required support and stability.”

— Portzei HaDerech Temporary Ways Ltd.

 

THE RESULT

The 500-ton Liebherr crane and supporting equipment operated on the platform for approximately one month, with the system remaining in its original configuration and maintaining the required stability throughout the project.

Beyond providing the working surface required for the crane operation, the MegaDeck HD+ mats helped Portzei HaDerech meet a highly compressed project schedule. Installation took approximately two days, compared with the at least one month of conventional ground preparation and subsequent restoration work the customer estimates would otherwise have been required.

The removable composite matting system also eliminated the need for dozens of truckloads of aggregate and fill, along with the associated spreading and compaction. At the end of the project, mats were simply removed, helping Portzei HaDerech avoid the land remediation associated with excavating and hauling away imported material and restoring the agricultural site. This also helped preserve the site’s natural water flow.

TEMPORARY INFRASTRUCTURE FOR CHALLENGING GROUND CONDITIONS

MegaDeck HD+ composite mats have become a regular part of Portzei HaDerech’s temporary access and heavy-duty working platform solutions. The company has completed dozens of projects using the system across a range of applications and ground conditions.

“MegaDeck allowed us to create a stable working platform for a 500-ton crane and supporting equipment over extremely weak, saturated ground, all within a very tight project schedule.”

— Portzei HaDerech Temporary Ways Ltd.

 

MegaDeck HD+ work platform install over mud

MegaDeck HD+ heavy-duty work platform

 


CASE STUDY

The Project: A heavy-duty working platform for a 400 kV electricity transmission structure

The Location: Central Israel

The Challenge: Create a stable working surface for a 500-ton crane over soft, saturated ground with extremely low bearing capacity

The Need: A rapidly deployable, removable solution that could distribute heavy crane loads without imported fill or major earthworks while maintaining the natural flow of water through the agricultural site

The Solution: 800 MegaDeck HD+ composite mats