SignaRoad® Composite Mats Create a Versatile Heavy-Duty Event Platform for Les Ardentes Festival
MB Tôlage is a Belgium-based provider of temporary access and ground protection solutions for construction, infrastructure, energy, electrical grid and major event projects.
For Les Ardentes, one of Belgium’s largest festivals and the largest rap festival in Europe, MB Tôlage needed a temporary surface capable of supporting the demanding requirements of event setup, live operations and dismantling.
THE CHALLENGE
The area surrounding the festival’s Phoenix Mainstage needed to serve two very different purposes.
During setup and dismantling, the temporary platform had to support trucks, heavy equipment and a 100-ton telescopic crane operating over grass and natural ground. Once the festival began, that same surface needed to safely accommodate thousands of festivalgoers.
Changing weather conditions added another consideration. The festival needed a stable, high-traction surface that could remain clean and accessible during wet conditions while helping prevent mud and water from coming up through the platform.
MB Tôlage evaluated multiple composite matting systems before selecting SignaRoad mats. Its combination of load capacity, traction, interconnected design and versatility made it well suited for a site that had to transition from an active construction environment to a heavily trafficked public event space.
THE SOLUTION
MB Tôlage installed approximately 32,300 sq. ft. (3,000 m²) of SignaRoad, using approximately 550 mats and 150 ramps across several areas of the festival site, including near the Phoenix Mainstage. The interconnected matting system created a continuous, stable platform that could handle intensive vehicle traffic and heavy loads while providing the traction needed for changing ground and weather conditions.
Installation was completed in four days during MB Tôlage’s first large-scale SignaRoad deployment. Signature Systems worked alongside the MB Tôlage team from the beginning, first conducting a full-scale product and installation test and later providing on-site support during the Les Ardentes installation.
“SignaRoad’s main benefits were excellent stability and traction, high load capacity, a continuous driving surface and relatively fast installation. Its versatility is also a major advantage.”
— MB Tôlage
THE RESULT
The SignaRoad mats remained in place for 17 days, supporting the different phases of event setup, the festival itself and dismantling. Throughout the project, the system remained stable under the loads and intensive traffic encountered on site. Its top surface helped maintain traction, while the interconnected mats provided a continuous driving and pedestrian surface over the underlying natural ground.
A SOLUTION DESIGNED FOR REPEATED USE
Immediately following Les Ardentes, the mats were removed in two days and transported directly to their next major event: the Formula 1 Belgian Grand Prix at Spa-Francorchamps. Quick removal without the need for site remediation, efficient transport and fast redeployment were key advantages of using reusable composite mats instead of wood or steel access solutions.
MB Tôlage plans to expand its use of SignaRoad across Belgium, Luxembourg, France and Germany for major events as well as industrial, energy and infrastructure projects.
“For contractors and project managers, we would particularly recommend SignaRoad when looking for a temporary access solution capable of handling intensive traffic while providing excellent stability and traction.”
— MB Tôlage


CASE STUDY
The Project: Temporary access and ground protection for Les Ardentes Festival
The Location: Liège, Belgium
The Challenge: Create a stable surface capable of supporting heavy equipment and intensive traffic over natural ground while remaining suitable for thousands of festivalgoers
The Need: A versatile temporary platform that could support a 100-ton telescopic crane, trucks and heavy equipment during setup and dismantling, then transition into a clean, stable circulation area for festivalgoers
The Solution: 32,300 sq. ft. (3,000 m²) of SignaRoad